You can decide to opt for two mechanisms:
• Sale of the land
• Annual payment of surface right
- In the latter case, an income is guaranteed for 30 years and we will take care of the disposal of the entire plant at the end of its life
This analysis is completely free
• Sale of the land
• Annual payment of surface right
- In the latter case, an income is guaranteed for 30 years and we will take care of the disposal of the entire plant at the end of its life
This analysis is completely free
Simply the cadastral parcels of the land and CDU (urban destination certificate) if available (even if old)
It is essential that the owner has a clear understanding of how the process works, which is basically divided into four phases:
STEP 01
Once the basic information has been provided, we will carry out an analysis of the constraints, an assessment of the connection point and a due diligence of the land to determine if it is actually suitable for the development of a photovoltaic system
STEP 02
Chiusa positivamente la fase 1, il terreno verrà sottoposto all’attenzione dei partner finanziari e si organizzerà a stretto giro la negoziazione e la sottoscrizione di un preliminare di vendita / diritto di superficie
STEP 03
At the end of the first two phases, the authorization process will begin by activating the procedure for environmental and regional/national authorization
STEP 04
This last phase is activated when the plant is actually authorized and therefore the final agreement is signed, and immediately afterwards the construction of the plant begins
STEP 01
Once the basic information has been provided, we will carry out an analysis of the constraints, an assessment of the connection point and a due diligence of the land to determine if it is actually suitable for the development of a photovoltaic system
STEP 02
Chiusa positivamente la fase 1, il terreno verrà sottoposto all’attenzione dei partner finanziari e si organizzerà a stretto giro la negoziazione e la sottoscrizione di un preliminare di vendita / diritto di superficie
STEP 03
At the end of the first two phases, the authorization process will begin by activating the procedure for environmental and regional/national authorization
STEP 04
This last phase is activated when the plant is actually authorized and therefore the final agreement is signed, and immediately afterwards the construction of the plant begins